
Rafael Duarte
Head of Motion
Filed under
Film
Reading time
5 min read
Planning something like this? We reply within a working day.
People see a one-minute film and assume it was a quick job. The Tidepool launch spot was shot in two days on a beach north of Lisbon. Everything before and after those two days is the part nobody sees.
Most of the work is cutting
We wrote eleven scripts. The one we shot was the shortest, with no voiceover and almost no product on screen until the last eight seconds. It was the scariest option for the client and the one their audience shared the most.
The edit took six weeks. Not because the footage was hard, but because every second we removed made the film better and every second felt expensive to lose.
Cut it for every screen
A launch film now has to work as a vertical story, a silent autoplay and a six-second bumper. We plan those versions on day one, so the framing works in all of them instead of being cropped as an afterthought.

